Assembling Solar Street Light Lamp at Kg Nelayan Vietnam, Bidong

Assembling Solar Street Light Lamp at Kg Nelayan Vietnam, Bidong

Kg Nelayan Vietnam, Bidong Terengganu is the location for our SWA pioneer project. It took us 3 days and 2 night to setup, assemble and install the solar light. 1st day: During the first day at Kg Nelayan Vietnam, we survey some good spot and dig that spot to install our solar light. At night, we discuss and do some transfer knowledge between technical team, sponsor team and management team through out the preparation process before we go to Kg Nelayan Vietnam. 2nd day: After proceed with surveying and digging the spot, we brew cement to support the solar light lamp. The cement is brewed using the specific ratio containing water, cement, sand and stones. The lower part of solar street lamp light is then cemented to keep it stand still on the ground. When the cement has dry, the upper part of the lamp is assemble to the lower part using PVC glue. Only by then, the important part of solar light consist of solar, the complete circuit and water bottle containing LED light in the transparent tube are being assemble to the upper parts of lamp. The solar street light lamp with the height of approximately 8 feet is assemble on targeted areas that received appropriate amount of sunlight at Kg Nelayan Vietnam, Bidong, Terengganu. 3rd day : We do some troubleshooting to some solar light and packed our thing-drive back to UMT.
Started Ended
Number of participants
13
Service hours
312
Topics
Youth Programme
Personal safety

Share via

Share