Kumbh Mela Service Camp 2013 @ Allahabad U.P.

Kumbh Mela Service Camp 2013 @ Allahabad U.P.

The Messengers of Peace of India are Providing service during the worlds biggest gathering. the details are as follows Kumbh Mela 2013 at a glanceFactors considered for estimation of Pilgrim and Resource/Infrastructure Planning : Kumbh 2001 was for 44 days while Kumbh 2013 will be for 55 days (+25%). Country’s population was 102.87  Crore in 2001, it is estimated to be 121.02 Crore in 2011 (+17.6%). The State population was 16.61 Crore in 2001 which has risen to 19.96 Crore in 2011 (+20%). Allahabad Nagar Nigam had 9.75 lakh population in 2001 which was 12.47 lakh in 2011 (+28%). Estimated Pilgrims during Kumbh 2013 S. NO.Bathing  DaysKumbh 2001Kumbh 2013 DatesEstimated   VisitorsDatesProjected Visitors  1 Makar Sankranti 14.1.2001 100 Lac 14.1.2013 110 Lac 2 Paush Purnima 09.1.2001 50 Lac 27.1.2013 55 Lac 3 Mauni Amawasya 24.1.2001 276 Lac 10.2.2013 305 Lac 4 Vasant Panchami 29.1.2001 175 Lac 15.2.2013 193 Lac 5 Maghi Purnima 08.2.2001 150 Lac 25.2.2013 165 Lac 6 Maha Shivratri 21.2.2001 50 Lac 10.3.2013 55 Lac Comparative Chart Describing The Infrastrucure And Services Being Provided During Kumbh-2013Mela Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 Area Hectare 1495.31 1613.80 1936.56 2 sectors No. 11 11 14 3 Parking Lots No. 35 44 99 Police Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 Police Stations No. 28 28 30 2 State Police Personnel No. 9965 10913 12461 3 PAC No. 35 45 46 4 Central Para Military Personnel No. 7 40 40 5 CCTV Camera No. 0 19 85 6 Variable Signage Board No. 0 0 30 7 Fire Station No. 28 28 30 PWD Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh - 2007Kumbh-2013 1 Length of roads laid Km 96.40 116.50 156.20 2 No  of Pontoon bridges No. 13 14 18 Jal Nigam Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 KLs of drinking water supply KLs 56000 76000 80000* 2 length of Pipelines Km 340 458 550 3 No of connections No. 15430 18523 20000 4 No of active tube wells No. 28 38 40 5 No of OHT in operations No. 2 2 5 Power Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 KWh of power consumed(Load) KWH 18 Mva 23 Mva 30Mva* 2 Length of electricity lines Km 565 665 770 3 No of Street light Points No. 16865 18000 22000 4 No of private connections No. 69489 94000 130,000* 5 No of Substations in operation (various categories) No. 49 62 73 Health and Sanitation Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 No of Allopathic hospitals No. 14 14 14 2 No of Homeopathy hospitals No. 07 07 12 3 No of Ayurvedic hospitals No. 10 10 12 4 No of beds in mela areas No. 360 360 370 5 No of Toilets No.         Individual   20481 17000 35000*   public toilets           Sulabh Complex (10 Seaters)   20 105 340   Trench Pattern   17100 12875 7500 (PRAI TYPE)   Non-conventional  Toilets   0 0 1000* Food and Civil Supplies Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 No of ration cards issued No. 127000 117481 200000* 2 Allotment of Wheat MT 13500 10000 16200 3 Allotment of Rice MT 7800 5000 9600 4 Allotment of Sugar MT 5000 - 6000 5 Allotment of K Oil KL 11000 6600 13200 6 PDS shops in the mela area No. 107 107 125 7 Allotment of milk KL 118 84.2 400 8 Milk Distribution shops in mela area No. 106 98 150 Roadways Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 No of Temporary bus stations No. 4 4 5 2 No of buses in operation(Reg.) No. 776 798 892 3 No of buses in operation(Spl) No. 2824 2202 3608 4 No of Pilgrims Lac 36.64 46.78 90.00* Railways Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 No  of  stations  in  operation No. 7 N/A 7 2 No  of  trains No. 600 N/A 750 Irrigation Sl. No.Service/ InfrastructureUnitKumbh-2001Ardh Kumbh -2007Kumbh-2013 1 Permanent Ghats No. 0 0 4 * - Approximate.
Number of participants
500
Service hours
50000
Topics
Legacy BWF
Youth Programme

Share via

Share